JINSUNG ENERGY TECH.CO.,LTD.
Product
introduction

JINSUG ENERGY TECH.CO.,LTD.
Tubocharger Test Bumer¡¡We are becoming one of the globalleaders
Gas Stand for Turbocharger

+ Hot gas generation though combustion chamber for constantpressure and temperature
+ Wide Range and Various Application for turbocharger
+ Fast data acquisition with RT (Real Time) Controller
+ Available Manual test / Full automatic test with requirements
+ Precise measuring with coriolis mass flow meter
+ Possibility of special test –high pressure in low temperature
+ Compact oil / water control cart
+ Optimization performance test & thermal shock test and data acquisition & analysis with latest developed
       Labview program
+Possibility of customized gas stand system Low Nox with 2 stage burning system

SystemCapacity Table

Description JGS 25 JGS 35 JGS 50 JGS75 JGS100
Hot Gas Mass Flow Rate -(kg/sec) Design 0.25 0.35 0.50 0.75 1.00
Normal 0.175 0.35 0.350 0.525 0.700
Minimum 0.008 0.012 0.017 0.025 0.035
Gas Burner Capacity -(kW) Design 260 360 520 780 1040
Normal 210 290 420 630 840
Minimum 4.5 7.5 9 13.5 18
Combustion Method 2 stage Low Nox
Compressed Air Pressure 800 kPaG at burner inlet
Fuel Gas Pressure 800 kPaG at burner inlet
Hot Gas Tempterature 1100 ¡É ( optional up to 1200 ¡É )
Combustion Method 2 stage Low Nox
Measuring & Data Acquisition RT ( Real Time ) Controller
Control Software LabViewSoftware
Oil Press/Temp/Flow Control Available Potable/Permanent Oil system
Water Press/Temp/Flow Control Available Potable/Permanent Water system
Thermal Shock Valve system Available Single/ Double Selection


¡ÜSystem configuration Diagram

System Configuration Diagram

 
Ansan City Danwongu Moknae dong 404-5 3 dong Tel:+82-31-319-7697 Fax:+82-31-498-7697 
mail:jinsungenergy@gmail.com
Copyrights (c) JINSUNG ENERGY TECH. CO., LTD. 2011. All rights reserved.